[{"data":1,"prerenderedAt":102},["ShallowReactive",2],{"active-categories":3,"blowouts":28,"tag-accc":83},[4,6,8,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27],{"category":5},"follow-the-money",{"category":7},"cost-of-living",{"category":9},"government-waste",{"category":9},{"category":9},{"category":7},{"category":7},{"category":9},{"category":9},{"category":5},{"category":9},{"category":9},{"category":7},{"category":9},{"category":9},{"category":9},{"category":7},{"category":5},{"category":7},{"category":9},{"category":9},[29,39,49,58,66,75],{"path":30,"title":31,"category":9,"date":32,"blowout":33},"\u002Fstories\u002Fbom-website-96-million-one-year-on","One year on: the BOM website that cost $96.5 million, not $4 million","2026-10-24",{"project":34,"originalCost":35,"currentCost":36,"announced":37,"note":38},"BOM website",4100000,96500000,"2025","$4.1m was the figure first given to the public.",{"path":40,"title":41,"category":9,"date":42,"blowout":43},"\u002Fstories\u002Fcross-river-rail-cost-blowout-19-billion","Cross River Rail was sold as a $5.4 billion project. The government now says it costs $19 billion","2026-10-25",{"project":44,"originalCost":45,"currentCost":46,"announced":47,"note":48},"Cross River Rail",5400000000,19041000000,"2017","Queensland Government figure (Oct 2025). It includes 25 years of tunnel maintenance and network works; Labor disputes counting them.",{"path":50,"title":51,"category":9,"date":42,"blowout":52},"\u002Fstories\u002Fhunter-class-frigates-27-billion-three-ships","Hunter-class frigates: sold as nine warships for $35 billion. We're now paying $27 billion for three",{"project":53,"originalCost":54,"currentCost":55,"announced":56,"note":57},"Hunter-class frigates",35000000000,45600000000,"2018","2020 Force Structure Plan estimate for nine ships. The program is now six ships; close to $27bn is allocated for the first three, including the Osborne shipyard.",{"path":59,"title":60,"category":9,"date":42,"blowout":61},"\u002Fstories\u002Finland-rail-cost-blowout-45-billion-parkes","Inland Rail was sold as a $10.7 billion project. It now costs $45.6 billion, and stops at Parkes",{"project":62,"originalCost":63,"currentCost":55,"announced":64,"note":65},"Inland Rail",10660000000,"2015","Both P90 estimates for the full Melbourne to Brisbane line. Only Beveridge to Parkes is now being built.",{"path":67,"title":68,"category":9,"date":42,"blowout":69},"\u002Fstories\u002Fnorth-east-link-cost-blowout-26-billion","North East Link was sold as a $10 billion road. It now costs $26 billion",{"project":70,"originalCost":71,"currentCost":72,"announced":73,"note":74},"North East Link",10000000000,26100000000,"2016","Victoria's December 2023 estimate. Includes the Eastern Freeway and M80 upgrades added since.",{"path":76,"title":77,"category":9,"date":42,"blowout":78},"\u002Fstories\u002Fsnowy-2-0-cost-blowout-25-billion","Snowy 2.0 was sold as a $2 billion project. It could now cost $25 billion",{"project":79,"originalCost":80,"currentCost":81,"announced":47,"note":82},"Snowy 2.0",2000000000,22200000000,"Target cost. Up to $25bn with contingency; transmission not included.",[84],{"path":85,"title":86,"description":87,"date":88,"category":7,"author":89,"image":90,"imageAlt":91,"bigNumber":92,"bigNumberLabel":93,"readingTime":94,"featured":95,"tags":96},"\u002Fstories\u002Fcoles-down-down-court-case-discounts-not-genuine","Coles Down Down court case: 13 of 14 discounts not genuine","The Coles Down Down court case: a judge found 13 of 14 discounts weren't genuine. No penalty until 2027, Woolworths awaits judgment, and profits are up.","2026-10-28","Aussie Outrage","\u002Fimages\u002Fcoles-aisle-trolley.jpg","A shopping trolley in a Coles supermarket aisle lined with stocked shelves and yellow price tickets","13 of 14","Coles 'Down Down' tickets the Federal Court found misleading, because the discount wasn't genuine",7,false,[97,98,99,100,101,7],"supermarkets","coles","woolworths","accc","groceries",1793703844574]